Client Case Studies

Flatbed and Heavy Haul Case Study: 98 Percent On Time for a Multi Facility Steel Project

FTL Case Study: $38,272 in Annual Savings on a High Volume Retail Lane

LTL Case Study: 18 Percent Cost Reduction Through LTL RFP Optimization

Reefer LTL Case Study: Reduced Temperature Excursions From 9 Per Quarter to Zero

Expedited Case Study: Emergency Generator Delivery for PGA and Super Bowl — Zero Downtime

Government / USPS Case Study: 98 Percent On-Time Delivery Across 450 Loads During One of the Harshest PNW Winters